This project aims to explore a data set containing 22125 observations of issues tracking and their history logs. The data set represents 5 years of project management which aimed maintenance and customization of many integrated systems (SIG) for the academic, administrative and human resources management at the Universidade Federal de Goiás (UFG).
A proprietary issue tracking system (SIGProject) was used to manage activities of company (ESIG) and client (Cercomp) teams.
I used data wrangling techniques to export data from that and clean them. The final data set, used in this project, and its documentation can be accessed, respectively, in these links:
The exported data set, the wrangling process scripts and an example of one issue tracking can be find in data_wrangling folder.
In this section, I perform a univariate exploration in the data set, by first examining the structure, followed by analysis of time-series variables and ending with the analysis categorical and range variables.
The issues data set contains 22125 rows and 24 variables. Of these 24 variables 16 are about issue data and 8 about issue’s logs.
## 'data.frame': 22125 obs. of 24 variables:
## $ issue_id : int 487247 487247 ...
## $ issue_number : int 88374 88374 ...
## $ issue_title : chr "Tarefa 88374 - Alteração de Finan"| __truncated__ ...
## $ issue_type : Factor w/ 4 levels "CUSTOMIZATION",..: 1 1 ...
## $ issue_creation_date : POSIXct, format: "2016-12-15 15:07:32" ...
## $ issue_system : Factor w/ 10 levels "INDEFINIDO","SERVICOS INTEGRADOS",..: 4 4 ...
## $ issue_start_date : Date, format: "2016-12-20" ...
## $ issue_subsystem : Factor w/ 77 levels "ADMINISTRAÇÃO",..: 34 34 ...
## $ issue_deadline_date : Date, format: "2017-01-03" ...
## $ issue_created_by : chr "HELENA CLAUDIA DOS SANTOS TEIXEIRA" ...
## $ issue_stakeholder : Factor w/ 2 levels "COMPANY","CUSTOMER": 1 1 ...
## $ issue_status : Factor w/ 10 levels "CANCELED","CUSTOMER CLOSING PENDING",..: 3 3 ...
## $ issue_time_spent : int 360 360 ...
## $ issue_priority_number: int 999 999 ...
## $ issue_progress : int 100 100 ...
## $ issue_priority_scale : Factor w/ 6 levels "SUSPENDED","LOW",..: 4 4 ...
## $ log_build_info : chr NA ...
## $ log_creation_date : POSIXct, format: "2017-04-10 17:07:00" ...
## $ log_action : Factor w/ 14 levels "CHANGE OF RESPONSIBILITY",..: 5 12 ...
## $ log_status : Factor w/ 34 levels "AUTHORIZED DEVELOPMENT",..: 7 4 ...
## $ log_progress : int 100 100 ...
## $ log_time_spent : int NA NA ...
## $ log_created_by : chr "ROSANGELA DIVINA DE SOUSA SANTANA" ...
## $ log_svn_revision : int NA NA ...
The number of distinct issues rows and issue’s logs rows are 4503 and 21978 respectively. That is, the number of issues represents 20% of the data set and the number of logs represents 99% of it. The 1% of logs remaining (147 rows) represents issues that do not have history logs.
The distribution and the summaries of number of logs per issue are ploted in the histogram below.
Note: In the plot above, the black dashed lines represent the 1st and 3rd quartile, the black and red solid lines represent, respectivaly, median and mean and the black dotted line represent the upper threshold to the outliers (3rd qu. + 1.5 IQR).
Analysing the plot above, we can note that 90% of issues have up to 9 history logs, 75% of them have up to 6 history logs and 50% of issues have between 2 and 6 logs, a narrow range. Despite the skewed shape of plot, the median and mean are very close. This means that the amount of ouliers (after 12 logs per issue) is low, approximately 4% of issues.
The representative narrow range of logs in an issue makes us think that there shoud be an activity flow pattern to resolve an issue. This flow pattern migth be observed in a commom sequence of log status. See more informations in the Log Status section.
The next 4 sections show the analisys of the timeline variables: issue_creation_date, issue_start_date, issue_deadline_date and issue_time_spent. In an issue tracking system, timeline variables is the fundamental piece for monitoring and control of activities.
The data set analyzed comprises issues created in the period between 05/21/2013 and 01/26/2018. More precisaly, between 19:10:24 of 05/21/2013 and 16:16:06 of 01/26/2018.
To get a sense of how it was the demand throughout the project see the plot below that shows the cumulated number of issues created along the project and the trend line (in blue).
We note that the first 11 months (from May 2013 to March 2014) of the project had very low demand, approximately 5% of the total. Some reasons for this were:
The work processes and knowledge on both sides (customer and company) were being built over those 11 months. The teams grew in size and new modules started development and deployment. The next 12 months (from April 2014 to March 2015) there was significant growth curve in demand (activities), approximately 25% of growth over the previous 11 months. From June 2015 the demand growth seems to stabilize, sometimes taking small growth curves. In this period occurred approximately 65% of project activities. Besides, the trend line fitted with growth curve demonstrating that the project began to have a standardized behavior.
Note: In the plot above, the black dashed lines represent the 1st and 3rd quartile, the black and red solid lines represent, respectivaly, median and mean.
Analysing the plot above, we note that the year 2013 had the lowest demand. The accumulated mean (red solid line) variates between 10 and 20 issues per month. At the end of 2013 and begin of 2014 there was a drop in activities because of the low administrative and academic activities at the university in this period. From April of 2014 until February of 2015 there was significant growth in activities. The accumulated mean increases from 10 to 70 issues per month. The accumulated mean overcame the accumulated median and the distance between accumulated 3rd quartile and accumulated median became greater than distance between accumulated 1st quartile and accumulated median. This means that theses months had a high number of issues created in relation to the past.
But from August of 2015 the pace of growth dropped. Now, we can note that the distance between accumulated 1st quartile and accumulated median becomes greater than distance between accumulated 3rd quartile and accumulated median. This invertion provocated the overlap between accumulated mean and accumulated median. The stabilization of growth also contributed to that. The average of growth pass to be only 10 monthly issues from February 2015.
We also note that except the significant growth period (April of 2014 until February of 2015) the months from September to December of each year had a decline in activities. The reason is the low administrative and academic activities at the university in this period. Thus, the demand for the systems decreases.
## min qu1 median mean qu3 iqr pc90 max
## y 1 406 817 643.2857 928 522 984.6 1017
## min qu1 median mean qu3 iqr pc90 max
## x 0 10 13 12.64624 15 5 16 23
## min qu1 median mean qu3 iqr pc90 max
## y 5 406 810 641.2857 921 515 993.6 1020
## min qu1 median mean qu3 iqr pc90 max
## y 1 258.75 282.5 250.6667 323.5 64.75 342.5 350
## min qu1 median mean qu3 iqr pc90 max
## x 0 0 0.5 2.205639 2.1 2.1 5.58 107.4
## min qu1 median mean qu3 iqr pc90 max
## x 0 0 0 10.87472 18 18 36 54
## issue_time_spent score
## 1 0 1430
## 2 6 242
## 3 12 241
## 4 30 187
## 5 18 174
## min qu1 median mean qu3 iqr pc90 max
## x 6 12 18 23.29553 36 24 48 54
## min qu1 median mean qu3 iqr pc90 max
## x 0.1 0.5 1.3 3.232018 3.4 2.9 7.78 107.4
In the issue tracking system, 4 types of issues were used to classify the purpose of a issue. They are:
## [1] "CUSTOMIZATION" "DATA MIGRATION" "MAINTENANCE" "OTHERS"
The frequency of issues created by each issue type is shown in the graph below.
Analysing the plot above, we note that most of the issues are of the MAINTENANCE type (around 75%). Next comes the issues of the CUSTOMIZATION type (around 20%). And, with less than 0.05% comes the issues of the types DATA MIGRATION and OTHERS. Thus, we can summarize that project management was characterized by corrective maintenance activities of existing systems and subsystems.
The demand for adaptation and evolution of the systems was not insignificant. Although the amount of CUSTOMIZATION and DATA MIGRATION issues are less than MAINTENANCE, they may have indirectly influenced in the creation of large volume of MAINTENANCE issues. Maybe, CUSTOMIZATION issues had provocated related creation of MAINTENANCE issues. The same is true for DATA MIGRATION. An analysis of issues creation timeline by system/subsystem may answer that assumption.
## issue_priority_number score
## 1 999 2272
## 2 0 427
## 3 1 243
## 4 2 192
## 5 3 148
## issue_progress score
## 1 100 4492
## 2 0 8
## 3 50 1
## 4 60 1
## 5 90 1
Go back: Data Set Structure
What is the commom flow of the log states? (Data Set Structure)
What makes the demand low in 2013? What makes the demand grow rapidly in 2014?